UMD CSPAC
College Park, Maryland
This project was designed and installed in several phases. We were heavily involved in the Construction Administration of the project to ensure tree survival.
The first two phases included the planting of large caliper trees ranging from 24” to 10” caliper. Drainage of these trees was a critical issue within the scope of this phase.
Other phases included issues with handicap accessibility, designing an earth graded amphitheater, submitting a forest conservation plan and enhancement plantings for a storm water management pond.